Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 28 results ...

Arriagada D., R E and Alarcón C., L F (2014) Knowledge Management and Maturation Model in Construction Companies. Journal of Construction Engineering and Management, 140(04).

Arriagada D., R E and Alarcón C., L F (2014) Modelo de Gestión y Maduración de Conocimiento en Empresas Constructoras. Journal of Construction Engineering and Management, 140(04).

Bertero, R D (2014) Great 2010 American Earthquakes: Lessons for Seismic Design and Construction. Journal of Construction Engineering and Management, 140(04).

Bertero, R D (2014) Los Grandes Terremotos Americanos del Año 2010: Enseñanzas para el Diseño y la Construcción Sísmica. Journal of Construction Engineering and Management, 140(04).

El-Anwar, O and Aziz, T A (2014) Integrated Urban-Construction Planning Framework for Slum Upgrading Projects. Journal of Construction Engineering and Management, 140(04).

El-Anwar, O and Aziz, T A (2014) Un Marco Integrado de Planificación Urbana y Construcción para Proyectos de Mejoramiento de Barrios Vulnerables. Journal of Construction Engineering and Management, 140(04).

Ferrada, X and Serpell, A (2014) Selección de los Métodos de Construcción en Proyectos: Un Problema de Conocimiento. Journal of Construction Engineering and Management, 140(04).

Ferrada, X and Serpell, A (2014) Selection of Construction Methods for Construction Projects: A Knowledge Problem. Journal of Construction Engineering and Management, 140(04).

Gallardo, C A S, Granja, A D and Picchi, F A (2014) Mejorias en la Productividad de un Proceso de Prefabricados de Concreto con Flujo en Linea Despues de un Esfuerzo de Estabilidad Basica. Journal of Construction Engineering and Management, 140(04).

Gallardo, C A S, Granja, A D and Picchi, F A (2014) Productivity Gains in a Line Flow Precast Concrete Process after a Basic Stability Effort. Journal of Construction Engineering and Management, 140(04).

Gelisen, G and Griffis, F H ( (2014) Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis. Journal of Construction Engineering and Management, 140(04).

Gelisen, G and Griffis, F H ( (2014) Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo. Journal of Construction Engineering and Management, 140(04).

Guillermo, M A, Grau, D, Acevedo, S C and Rivera, T E (2014) How the Design and Assessment of Instruction/Learning Strategies Influence the Academic Performance of Civil Engineering Students at Universidad Industrial De Santander, Colombia. Journal of Construction Engineering and Management, 140(04).

López del Puerto, C and Shane, J S (2014) Claves del Éxito en la Gestión de Megaproyectos en México y los Estados Unidos: Un Estudio de Casos. Journal of Construction Engineering and Management, 140(04).

Lopez del Puerto, C and Shane, J S (2014) Keys to Success in Megaproject Management in Mexico and the United States: Case Study. Journal of Construction Engineering and Management, 140(04).

  • Type: Journal Article
  • Keywords: Project management; Construction management; Case studies; United States; Mexico; Complex projects; Project management; Megaprojects; Case studies;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000476
  • Abstract:
    The transportation industry is continually developing larger complex projects in an effort to keep the traveling public and goods moving. Investigating successful projects enables practitioners to apply and refine successful practices in order to manage future projects more effectively. This paper investigates the Transportation Expansion (T-REX) project in the United States and the Highway Durango Mazatlan project in Mexico to discover practices that supported the success of these two large, complex projects. Both projects have historic significance. T-REX was the first design-build project in the United States that included both major highway and transit elements and the Highway Durango Mazatlan project is the largest construction project to date in Mexico. The Highway Durango Mazatlan project was designated by Mexico’s president as the project to commemorate the bicentennial anniversary of Mexico’s independence. This mega-project was designed and is being built to highlight Mexico’s capability of designing and building state-of-the-art transportation projects. The methodology used in this investigation was case study research with in-depth interviews of project managers. The investigation found that the greatest challenge for both project teams was constantly adapting to a challenging work environment. The common themes that contributed to the success of the projects were (1) early agency agreements and commitments, (2) understanding about the cultural and socio-political circumstances surrounding the project, (3) public outreach, and (4) recognition of circumstances that had an impact on the project.

Mejia A., G, Grau, D, Acevedo, S C and Rivera, T E (2014) Evaluación, Diseño, e Influencia de Estrategias de Instrucción-Aprendizaje en el Desempeño Académico de los Estudiantes de Ingenieria Civil en la Universidad Industrial de Santander, Colombia. Journal of Construction Engineering and Management, 140(04).

Migliaccio, G C, Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous Quality Improvement Techniques for Data Collection in Asset Management Systems. Journal of Construction Engineering and Management, 140(04).

Migliaccio, G C, Bogus, S M and Cordova-Alvidrez, A A (2014) Tecnicas de Mejora Continua de la Calidad de la Recoleccion de Datos en Sistemas de Gerencia de Capital de Infraestructura. Journal of Construction Engineering and Management, 140(04).

Orozco, F A, Serpell, A F, Molenaar, K R and Forcael, E (2014) Modelando los Factores e Índices de Competitividad para Constructoras: Hallazgos en Chile. Journal of Construction Engineering and Management, 140(04).

Orozco, F A, Serpell, A F, Molenaar, K R and Forcael, E (2014) Modeling Competitiveness Factors and Indexes for Construction Companies: Findings of Chile. Journal of Construction Engineering and Management, 140(04).

Palacios, J L, Gonzalez, V and Alarcón, L F (2014) Selección de Formas de Relación con Terceros en la Construcción. Journal of Construction Engineering and Management, 140(04).

Palacios, J L, Gonzalez, V and Alarcón, L F (2014) Selection of Third-Party Relationships in Construction. Journal of Construction Engineering and Management, 140(04).

Pellicer, E, Yepes, V, Correa, C L and Alarcón, L F (2014) Model for Systematic Innovation in Construction Companies. Journal of Construction Engineering and Management, 140(04).

Pellicer, E, Yepes, V, Correa, C L and Alarcón, L F (2014) Modelo para la Innovación Sistemática en Empresas Constructoras. Journal of Construction Engineering and Management, 140(04).

Schexnayder, C, Alarcón, L F, Antillo, E D, Morales, B C and López, M (2014) Observaciones de Desempeño de Puentesdurante el Terremoto de Chile en 2010. Journal of Construction Engineering and Management, 140(04).

Schexnayder, C, Alarcón, L F, Antillo, E D, Morales, B C and Lopez, M (2014) Observations on Bridge Performance during the Chilean Earthquake of 2010. Journal of Construction Engineering and Management, 140(04).

Yates, J K (2014) Design and Construction for Sustainable Industrial Construction. Journal of Construction Engineering and Management, 140(04).

Yates, J K (2014) Diseño y Construccion para una Construccion Industrial Sustentable. Journal of Construction Engineering and Management, 140(04).